Tile to metal in Stafford Heights

After photo
Suburb Stafford Heights
Home 1962 post-war, single storey
Roof size 186 m²
Old roof Concrete tile
New roof COLORBOND® steel, corrugated
Colour Monument®
Duration 4 days
Extras New insulation blanket, gutters, fascia

The problem

Concrete tiles porous and cracking, three leaks in two years.

What we did

1
Day 1 Stripped the first run of concrete tiles and checked every batten. Replaced eleven that had split.
2
Days 2 and 3 New insulation blanket, then COLORBOND® Monument® corrugated sheets, flashings and ridge capping.
3
Day 4 New quad gutters and fascia to match, downpipes reconnected, site cleaned and magnet run over the lawn.

Before and after

Before
After
Before After
↔
“Full re-roof on our 1960s place. Old tiles off, Colorbond on in four days. They moved the start date twice because of rain and rang me both times before I had to chase.” Daniel M., Stafford Heights